Skip to content
ND Nwaneri
Local time in Amsterdam:

ComEd

Moved a utility's grid planning work off paper and onto AI tools.

Operations intern, Joliet, Illinois · June – August 2026 · Solo

What it is

Two internal tools for the team that plans changes to the power grid: an AI agent that reads grid design documents and works out the exact edits to the utility's digital grid model, and a mobile app that replaced a paper-and-Access field verification process.

My role

I designed and built both tools during my internship.

Result

20–30 min

Grid change requests went from 1 to 3 hours down to 20 to 30 minutes, catching about 80% of required changes across 25 test cases. Field verification moved off paper for 100+ projects, saving about 200 hours a year.

  • Copilot Studio
  • Power Apps
  • Dataverse